(1) Quarry Development (1982) Quarry at Anderson Road Blasting at the upper bench and the sand plant at the bottom of the quarry Loading by Cat 988C wheel loader and Cat 769 dump trucks A bamboo blasting fence to prevent fly rocks from blasting at the rock berm below. A Cat D8k bull dozer and an excavator in front of the rock berm. The Wimpey Asphalt plant at the other side next to the quarry. (2) Guangdong Shajiao "B" Power Plant (1985) 2 x 350 MW coal fire power station at Shajiao 600T cement silo (3) Kowloon Park Redevelopment (1988) Construction of skylight and roof cladding of the indoor swimming pool and sports center for the Redevelopment of Kowloon Park (4) Underpass of Tuen Mun Road at So Kwun Wat (掃管笏) (2001) 點擊圖片放大 7 x 600mm and 24 x 800mm dia steel pipe by pipe ramming method across Tuen Mun Road