Determine the shower room according to the layout. according to the structure. The newly-applied floor tiles still need a time to dry. Poor disassembly may affect the re-paving waterproof and ceramic tiles.8 meters, and the wall of the non-shower area is less than 0. After finishing the floor of the tiles, wait another 1-2 days and wait until the tiles are completely solid before using. There must be no water residues, and there will be no puddles in a certain place. In addition to the cost of demolition, it will cost about 1,000 yuan to re-waterproof, paving China PVC Hoses about 300 yuan, about 200 yuan for floor tiles, and about 1,200 yuan for wall tiles. Cost: Foundation construction is about 3,000 yuan. Of course, it is better to waterproof the entire wall. Consumers can make different combinations according to their own needs. Splash water in the bathroom at home, and then go to the same location downstairs to take a look. Therefore, excluding the money for buying bricks, the entire basic project will cost about 3,000 yuan. In these places that are prone to dampness, try not to choose wooden doors when changing doors, and you can use moisture-proof aluminum alloy doors instead. Waterproof: Choose rigid and flexible waterproof . Generally, bathrooms larger than 4 square meters (decoration renderings) can be installed, and the height of the room cannot be less than 2.Recently, some readers have inquired that the neighbors downstairs should be reinstalled because of the leak in the bathroom. If the residents want to further decorate, re-ceiling, and then replace the bathroom with new mirrors, toilets, bathroom cabinets and some sanitary hardware accessories, almost 10,000-20,000 yuan will be needed. The better way is to remove the original tiles and waterproof layer, rebuild the waterproof layer, and re-lay the tiles. The key point of restroom reinstallation is waterproofing. Generally, the wall of the shower area is less than 1.9 meters. Rigid waterproofing is easy to break when spreading on the ground. It is better to carry out measurement and planning in advance, including the location of wires and the setting of leakage protection switch devices. Professional workers should help to remove it. Construction period: about 6-9 days