Manufacturing unit: 1. manufacturing license; (copy) 2. manufacturing details: (copy) 3. whole model test; (copy) 4. product quality certificate; including: door lock, speed limiter, Safety gear, buffer, upstream overspeed, drive host, electronic component safety circuit (if any), control cabinet, factory certificate (copy) 5. Door lock, speed limiter, safety gear, buffer, upstream overspeed, Drive mainframe, electronic component safety circuit (if any), control cabinet, type test certificate; and commissioning certificate of speed limiter and safety gear; (copy) 6. The layout of the hoistway includes: top height, bottom pit depth, Floor spacing, protection in the hoistway, safety distance, space accessible by people under the hoistway, etc .; (copy) 7. Electrical schematic diagram; circuit including power circuit and electrical safety device; (copy) 8. Operation and maintenance instructions, including Installation instructions for installation, use, daily maintenance and emergency rescue; (copy) Installation unit: 1. Installation permit and installation notice; 2. Construction plan; 3. 3. Special equipment operator ID for construction site personnel; 4. 4. Construction process records and self-inspection reports; factory inspection reports; The installation quality certification documents include: the elevator installation contract number, the installation unit installation license number, the product factory number, the main technical parameters, and the official seal or inspection qualification seal of the installation unit and the completion date; Time), the procedure proposed by the user and approved by the machine manufacturer. 7. On-site quality assurance person in charge, installation person in charge, on-site safety officer appointment letter and on-site operating procedures. Reconstruction, major maintenance information: 1. 1. Details of the elevator decoration manufacturers or maintenance permit and the notice of modification or major maintenance and the permit certificate; 2. List of transformations or major repairs and construction plans; 3. Certificate of type test certificate of replaced safety parts; Commissioning certificate of speed limiter and safety gear (if replacement occurs); 4. 4.